Synergy3
Creation of a whole is greater than the simple sum of its parts.

The integrated design approach has been carried out in three steps. First, focused on reducing the need for energy and resources. Second, focused on maximizing possibilities of producing energy by the building using assets of its localization and architectural elements. In the third step both the previous steps were confronted allowing finding self-sufficient building that size and form is chosen in order to balance energy demand with simulated energy production. The form finding process and assumed energy demand and production resulted in self-sufficient building producing over 2kWh/m2/year.

Design: 2015
Size: 18 350 m²
Client:Entra
Location:
Lilletorget 1, Oslo, Norway
Authors:
Krystian Kwieciński
Jacek Markusiewicz
Agata Pasternak
Visualization:
Karol Terlikowski
Engineering Consulting:
BuroHappold Engineering
Sustainability Engineer:
Manuel Delgado
Energy Engineer:
Ander Gortazar Balerdi
Energy and HVAC Engineer:
Julia Kamińska
Structural Engineer:
Konrad Leski
Structural Engineer:
Paweł Młynarczyk
Type:
Competition